Chain length marking

did you weave only the unlayed strands or the entire 1/4" line??
 
Sorry just found this on line, have not tried it myself yet but seems like a great idea to me!

Cor
 
I use colored cable ties myself in 25 foot increments. We anchor a lot, so they tend to break off once year or so. When they do, I just "round up" to about the next marker; I can count fairly well how long it takes to let out 25 feet if I feel the need for preciseness, but with 8 feet of freeboard off the bow, it's not that much more scope if I don't. Replacing the busted ones is usually not high on the "to do list". That idea of using electrical tape (I think some version of "Rescue Tape" would be better) and then putting the cable tie around that is kind of neat, and would make it a lot more visible. I'll try that next time.

George
Hatteras 56MY
 
I put the plastic inserts in my chain but found them disappointing as it is near on impossible to see them from the flybridge even when a large section of links are done together, for those interested though they do make them in a few different sizes

Regards Brad
 
quote:

Originally posted by pdecat

did you weave only the unlayed strands or the entire 1/4" line??






You weave in the line. It lasts for years and doesn't cause any problems for the wildcat.
 
quote:

Originally posted by deerows

quote:

Originally posted by The Other Gary

The Brits sell these for metric chain, not sure if they are available for North American chain sizes.

3234.jpg


Do a google search for "anchor chain markers". These are available for various size chain.













Ah, I see Defender carry's them in 1/2". I wonder how well the stay in the links? Anybody here using them?
 
I have them in 100' of chain. They work well, however, I have only used the anchor aprox. 20 times since installing them. The come in sets of 10, which will mark 40' of chain if you mark every 10' and use one marker to indicate 10' (1 = 10, 2 = 20, 3 = 30, 4 = 40). I bought 2 colors (10 each) which results in a color change at 50' and no markers after 80'. This seems to confuse crew working the windlass (What does 2 blue mean? 60' feet) I would suggest writing down your coding scheme somewhere that is easy to reference when paying out rode.
 
I’m going to try the colored rope idea because I wouldn’t be able to see the cable ties from the bridge.
I guess any bright color every 50’ or so would work but are there any suggestions for a color pattern?
 
Back
Top