Delta Coves Project

It will be interesting to see how soon Delta Coves shows up on NOAA charts. Think the entry through the levee breach will be gated? ;)
 
In the Oct 24 and Nov 14 meeting summaries, I note references to mooring the docks with chains--and the pictures of individual (homowner) docks appear to have no visible pilings and some appear to remain in place before attachment of gangways. How in the dickens are these individual docks being anchored, and why aren't pilings being used?

BTG
 
I'm anxious to see how Bethel Island changes when this project begins housing residents. I'm fearing the worst and hoping for the best.........

They have plans for a yacht club facility. I wonder will they start a third YC or will one of the other two move over there???? They are promising two year club membership with the purchase of a property.
 
BTG, read the provided link to BIMID's website. The latest report mentions pile driving has been delayed......
 
Bigwaveohs:

Those new boaters won't be inexperienced for long. The problems will be at the bars that have guest docks. Women leaving without their PFD's and stuff like that.

FindMe
 
Flutter, I read that link before I posted. It says the barge, which can't get in until the sheet piling is removed, is going to be driving piles for the marina. I'm asking about the individual homeowner docks, which are reportedly all in place....

BTG
 
Back
Top