This video is almost 4 years old but so a lot has been done since but it shows the modified layout with the centerline full size bed up front and the expanded master combining it with the midship stateroom I don’t think I posted it before
Last month before paint
And back in 2017 after Irma. By then the 20’ long opening in the toe rail had already been repaired.
And right after the storm. 20’ of toe rail had been ground away with a 3” opening. The hull side was just moving in and out yet no stress crack in the hull side. Broke a piling right at the water line. Come a long way since even though it s been a slow process
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.