Contra Costa County won approval for its water quality project and will run a pipeline and new pumping station out to Victoria Canal. The new project will not increase the total water CC can pump, but allows it to choose between two water intake points.
http://www.ccwater-alternativeintake.com/pdfs/AIP fact sheet.pdf
A contract to help build the new system was awarded last week. Construction will begin this year.
http://www.hdrinc.com/8/34/default.aspx?entry=430
http://www.ccwater-alternativeintake.com/pdfs/AIP fact sheet.pdf
A contract to help build the new system was awarded last week. Construction will begin this year.
http://www.hdrinc.com/8/34/default.aspx?entry=430