I am an active member in our yacht club and we are begining to research the rebuilding our docks and bulkhead. We are located on the Cheaspeake Bay area near Annapolis. My question is what is the prefered type of material for the this area. Pressure Treated of Creasote(?) type pilings. What diameter pilings are prefered. Our slips range from 30' to 60'. Are floating docks more or less expensive? Pro's Cons... Bulkhead material, lumber or other? Any coments would be appreciated. Thanks I4NI
 
First off what's the budget? If you have buckets of money, then prestressed concrete bulkhead panels, prestressed concrete deck sections and prestressed concrete piles are the way to go. Build it once and it stays, no rot, no worrying about worms, but costly to buy and install. No sure of the height of your bulkheads but heavy gauge plastic sheet pile, with treated wood piles, treated wood whale timbers and treated wood batter piles with galvanized all thread tie backs work well (each pile should have it's own tie back). Floating docks are more expensive and require more skill to build and install. I'm sure creosote material is banned on the Cheaspeake, unless you are the Federal Goverment, then you can use all you want. The coal tar is not good for the fishes, not to mention the guy who install's it. If what you have now works, duplicate the sizes (pile diameters, deck supports, cross frames) use good quality commercial grade galvanized fastners. Drive all the piles to resistance, don't accept jetting. Talk to a good marine construction company that is fully insured and owns their own equipment (tugs, barges, cranes, etc.) If you are starting from scratch talk to an Engineer for sizes, etc. Is the yacht club a sailing club or chicken eaters? Good luck.
 
I'd hire a consultant to get you started with the right materials for your area. Do it once, correctly.
 
Back in the day, I was involved in the redesign and construction of our yacht club over almost 20 years.
One of the finest engineering firms I worked with was Paulus, Sokolowsky and Sartor in New Jersey.
I actually did the design and supervised construction of our floating docks, starting in 1976 when we re=built for OpSail '76, and then over the next 20 years as we expanded, installed a travel lift, rebuilt, dredged, etc. It was a very rewarding experience, and due in large part to the fact that we had access to good engineers, a good local contractor to do the breakwater and committed members, as we built the docks and fingers ourselves, built the light stanchions ourselves, and did the plumbing and electric for he docks ourselves.
For what they may be worth, I'd be happy to send you some copies of the drawings and specs, keeping in mind that they may be 20+ years old and are for reference only, not meant to be for your project. As others have stated, a qualified engineer will sit down with you and discuss your needs vs your budget, and recommend accordingly.
Since most anything you do requires USCOE approval as well as possibly state and local (EPA) approvals, a well-know, well established engineering firm is essential.
PM me if you want them.
Stan
 
Talk to some local companies that specialize in this. I just went through this, just on a smaller scale at our lake house. The differences between how it is done on different lakes was interesting, a lake ten miles from us has 100% floating docks and rip rap sea walls, our lake has all stationary docks and mostly treated lumber sea walls. Just for my small dock and sea wall repairs I had to get permits, provide a construction plan and a soil disturbance plan because I was driving pilings into the lake bottom. There are also restrictions on the size and how rainwater is diverted from the structures roof (cannot go directly into the lake). The contractor I hired was local and familiar with the process, still took 3 months to get all the permits. Having someone who knew the construction methods and process in that area was key.
 
I4

Hope you have a permit... and are aware of the requirements of the Chesapeake Bay Protection...100' set back with a NO disturb zone from there to MLW...

Don't just think you can do it...In woodbridge, VA and on the Northern Neck, I know fo two cases where the Corp/Fed/Statejsut laid two pictures on the table....Satellite before and after...

Creosote, coal tar, copper and any other heavy metal has been banned for some years now.

Whatever you do, don't "jet" them in ...our neighbor just spent $100K on 150' of composite bulkhead and her boathouse/dock redone. Every wood piling has already started to rise, shift or tilt in less than a year...pile driving is the best and Pearson Composites materials seem to do the best over time.

Best of luck, and hope that the County, state and Feds are gentle with you. Neighbors permit took over a year, and that was for "rebuild" of what she had....

dave
 
Thanks for the comments thus far. It is not my intent to do the job myself or without permits. I am just at the learning phase and trying to gain some insight on this process. I am very aware that the Chesapeake location will have many environmental regs. I believe that this type of construction can only be done a certain time of the year as well. IS anyone aware of any definitive books or manuals on the subject?
Again thanks, I4NI
 
I4NI,

We just put a new bulk head in at our club. We went vinyl. It took us 2 years to get the permit to replace an existing bulkhead. But that's New Jersey. We had a company that did everything from design to install, including most of the permit work.

Docks, float or fixed is up to you, what kind of Tidal range do you have, much more then 2-3 feet you will really want floating docks. Also how much freeze up, or Ice do you get. Most of what I have seen in the Chesapeke, has been fixed docks, on pilings. If the money is there go Trex or some other composite material for the decking, you will n ot regret the results over PT lumber.

Good Luck.

PS what is the name of the club?
 
Here are my experiences...we build all of our own floating docks. WE have 6'x20' mains and 2'x16-2' fingers. Some fingers are composed of two 3'x16' hinged. All the plans are fairly standard, we use galvanized l-brakets with 1/2" bolts. No nails are ever driven. The PT frames, out of the water seem to last decades. It's usually a punctured float or worn out decking that doesn't survive. We use lag bolts to bolt on self contained floats. We have experimented with Trex and this seems to be the way to go. While it does cost and weigh more, like I said, the decking is usually what fails first. Usually the ends where the screws are split...sun, water and snow/ice kill them.

We have a seawall/break water wall made from steel "I" beams and wooden panels....do NOT do this..this only lasted 20yrs. The copper in the PT wood reacted with the steel and ate it away.

Alot of folks have gone with vinyl bulkhead, I'd look into that. OR, what I wanted to do was simply drop rip-rap into the water and forget about the bulkhead...think about it.
 
I am told that on bay water, if you have bulkhead, you have to maintain/replace it...if you use rip-rap it has to be applied in a certain way,by a "licensed" installer (what ever that means) and that whether you can use rip rap or a bulkhead is determined by the activity of the water... the State of Va has approved concrete "jersey wall" looking things as bulkheads in some places, not sure about Maryland.

Composite is the way to go for both pilings and decking...new PT is the pits, may last a couple of years, not more than 5 or 6 in direct sun/water without problems.

We used Bayshore Designs in Kinsale, VA as our agent. They are really good, easy to deal with and affordable.
 
I know of a highly recommended company that works on the northern portion (don't know where HQ is but it must be somewhere on the mid bay) that has just finished two different floating docks for two marinas and is putting in a third right now. I can get the name if you want.

Unfortunately I don't think there are any good articles/books on the subject. At least up here I think they have the monopoly because permitting is considered a real pain. They probably have a good reputation for building to the permit. Amazed from having to go to zoning for my house, how many permits are obtained and then surprise! Structure is bigger. Apparently some people have done the math and found its cheaper to pay the fine.

Rumors say one large owner offered to deposit $100k towards fines with the tacit understanding they could do what they want.....times are changing and maybe that accounts for the grief they are now facing.
 
This is not an amature undertaking. You need to initiate contacts with the professionals who do this. They are familiar with the permits, materials and way that they can be applied. The cost is very expensive. Floating docks are usually used in areas with significant tide (more than 3 feet). Re-inforced Concrete is certainly the best material for pilings. Be sure that the contractors drive the butt end of the pilings down--not the thinner top end--which is easier--but comes out easier. If properly done, jetted in pilings can work well, in some environments--driving is often better-or a combination.

Also consider what the insurance will cost on the docks--it may very for materials--and it may cost almost as much as the docks do! Consider the electrical, water and any lift systems when you start the project.

You need to be more aware of the needs of the YC--and let the professionals do the design--the size of the pilings, the spacing, the connections etc.
 
I4NI - I'm not sure which club you're with, but you have a wealth of information there locally in Annapolis. Call the other clubs. Talk to the basin directors. You'll get plenty of information to help.

As for me, I'm at Maryland Yacht Club up off Rock Creek. We rebuilt our piers about 10 years ago. Floating, while nice, is VERY expensive, and not really needed for this area. We built our piers and catwalks about a foot higher than normal, to help with the ever-so-often high tide. I leave my boat in 365 and have so far not had a problem with super-high or super-low tides (there hasn't been a super-high since I've been there, but I've seen low where the top of my canvas is even with the pier).

Again, call the other clubs around the area. You'll find somebody who's been through this before and willing to help.
 
If the water is shallow at the bulkhead jetting may be the only option. Do not let whom every jet ant poles where a barge can reach at high tides.
I would look into the vinyl c lock system. Do not use rip rap unless you like snakes and other critters. Take it from me I have rip rap in front of my house and it was a big mistake.
If you use wooden pilings make sure you cover the top with cones caps. This keeps the water from entering the wood during the winter and freezing and also keeps the birds off the piling. No birds, no poop.
 