Hello,
I just built a floating dock for one of my clients. We replaced an existing one that went with the previous owners of the house.
My dilemma is this: the floating dock is attached to a rigid dock with 2-1/4" galvanized pipe. The pipe is sunk into the ground on one end. At the other, it comes to an elbow then is joined to the rigid dock with a bolted on flange. The Chesapeake Bay experiences considerable changes in tide. The other day, when the tide was high, I noticed the dock was up to the maximum height (where the 2-1/4" pipe attaches to the rigid dock joists with 90 degree elbows and flat mounting flanges). Over time I can see this putting considerable strain on both the rigid and floating docks. What has me worried is last year I visited the dock when the water was higher that the rigid dock!!
Any suggestions would be greatly appreciated!
I just built a floating dock for one of my clients. We replaced an existing one that went with the previous owners of the house.
My dilemma is this: the floating dock is attached to a rigid dock with 2-1/4" galvanized pipe. The pipe is sunk into the ground on one end. At the other, it comes to an elbow then is joined to the rigid dock with a bolted on flange. The Chesapeake Bay experiences considerable changes in tide. The other day, when the tide was high, I noticed the dock was up to the maximum height (where the 2-1/4" pipe attaches to the rigid dock joists with 90 degree elbows and flat mounting flanges). Over time I can see this putting considerable strain on both the rigid and floating docks. What has me worried is last year I visited the dock when the water was higher that the rigid dock!!
Any suggestions would be greatly appreciated!