Well it was a long day on Saturday but the new floor is down. Just have to add a couple of trim pieces and were good to go.
The fun part was having to cut a new subfloor as the previous had to many imperfections. That was a lot of up and down getting the template just right and then cutting all the smaller pieces to fit into the curved areas.
Really liked using the Evercoat Forumla 27 to fill the joints. Very quick drying stuff.
Can't wait to start enjoying, shouldn't be long now.
Sorry for the bad cell phone pics.
The fun part was having to cut a new subfloor as the previous had to many imperfections. That was a lot of up and down getting the template just right and then cutting all the smaller pieces to fit into the curved areas.
Really liked using the Evercoat Forumla 27 to fill the joints. Very quick drying stuff.
Can't wait to start enjoying, shouldn't be long now.
Sorry for the bad cell phone pics.